Phosphate Mining
Phosphate Rock Mining for INDORAMA ICS in Senegal
NHD supplied a 20m² horizontal belt filter for phosphate rock mining — its first application of the belt filter in mineral processing. From November 2019 to August 2021 NHD ran on-site surveys and filtration tests, supervised installation, and met all targets for production capacity and cake moisture.