Described as the world’s first lateritic nickel ore project to be rapidly constructed and reach full production, with designed and actual capacity aligned in 2017. NHD modified equipment from international suppliers, accelerating the client’s production ramp-up.
Project details
- Location: Papua New Guinea
- Industry: Nonferrous Metal Smelting
- Scope: Engineering, equipment supply, installation and commissioning
Equipment supplied
NHD scoped, manufactured and commissioned the process equipment for this project, matching materials and capacity to the site’s operating conditions and integrating with the client’s upstream and downstream stages.





