AngloGold Ashanti plans to invest about $2.5 billion in a copper project in Antioquia, Colombia, with production targeted from 2028 at roughly 80,000 tonnes of copper a year, subject to environmental permits, according to Reuters reporting on 17 November 2026. A project at this stage fixes its tailings route on paper years before the first ore is crushed, and that route decides the water the plant can return, the form in which tailings leave the site and a large part of the permit case. For tailings that suit mechanical dewatering, an automatic filter press is one of the main candidates, and its throughput and cake moisture on a given stream are established by testing that stream as slurry.
Tailings Dewatering Is Decided at the Design Table
What a New Copper Project Must Fix Early
The engineering study has to state how much tailings the plant will produce each day across the mine life, where the dewatered cake will go, and how much water must return to the process. Cake moisture decides whether tailings can be conveyed, stacked or hauled without free liquid, and it drives the size of the storage facility and the water balance the environmental application is judged on. Equipment chosen after these figures are fixed can only fit inside them; equipment considered while they are being set can still change them.
Where Pressure Filtration Fits
Pressure filtration suits tailings whose particle size and mineralogy let a cake form, build and release cleanly. It returns filtrate directly to the plant as process water and produces a cake dry enough for mechanical handling, which is why it is evaluated for projects where water recovery and a compact tailings footprint carry weight in permitting. What has to be shown is narrower: that this project’s tailings, tested as slurry, reach the moisture and cycle time the design assumes.
The HDLY Cycle: Six Stages, Fully Automatic
Filtration, Squeezing and Air Drying
The HDLY vertical automatic pressure filter runs six stages in sequence: filtration, first squeezing, cake washing where the duty requires it, second squeezing, air drying and cake discharge. Maximum filtration pressure is 1.6 MPa and cake moisture can be held at or below 10%, with cake thickness up to 45 mm. At the same filtration area, throughput is more than six times that of a plate-and-frame press, which is what makes the type practical at mine scale. In copper hydrometallurgy service, two 144 m² HDLY units are running in the Democratic Republic of Congo.
Discharge, Cloth Washing and Self-Diagnosis
Discharge is automatic, and the filter cloth washes itself on both sides in alternation, which keeps the filtration rate from decaying as fines accumulate in the cloth. The machine monitors its own running state, diagnoses faults and alarms, so a slowing cycle is visible to the control room as data rather than discovered at the discharge conveyor. The four-column vertical structure keeps the footprint small for the installed area, a point that matters when the dewatering plant competes for space inside the concentrator fence.
The Tests That Set Pressure, Cloth and Cycle Time
What a Tailings Slurry Test Must Measure
The test programme works on representative tailings, including the fine fraction and clay content the plant will actually produce, at the solids concentration the thickener will deliver. It measures filtration rate against pressure, cake moisture against squeezing pressure and time, cake release behaviour, and how quickly the cloth blinds across repeated cycles. Each of these results removes one assumption from the design: together they state the pressure the cake needs, the cloth it needs and the cycle it will run.
From Test Results to a Working Specification
Specification follows the test sheet. Filtration and squeezing pressure are set inside the machine’s 1.6 MPa envelope at the lowest pressure that reaches the moisture target, because excess pressure costs cycle time and cloth life. Cloth selection comes from the filter cloth series against the measured blinding and release behaviour, and cycle time converts the daily tonnage into filtration area and unit count. Feed stability closes the loop: a high-rate thickener ahead of the press holding a steady underflow density is what lets the tested cycle time survive contact with the real plant.

Conclusion
The tailings and water figures in the project’s design documents will be examined in permitting and built into the plant, so they need test work behind them. A press selected from tested pressure, cloth and cycle data arrives with its capacity already demonstrated on the project’s own slurry. Send NHD the tailings tonnage, particle size distribution, feed solids and target cake moisture at sales@chinanhd.com or WhatsApp +86 136 6732 4277, and the test scope and press sizing will be defined from those figures.
FAQs
Q1: What cake moisture can an HDLY press reach on copper tailings?
A1: The HDLY design holds cake moisture at or below 10% at a maximum pressure of 1.6 MPa. The value a specific tailings stream reaches is confirmed by slurry testing, since fines and clay content move the result.
Q2: Why must the slurry be tested before pressure and cloth are chosen?
A2: Filtration rate, cake moisture, cake release and cloth blinding all depend on the tailings themselves. Testing measures them directly, so pressure, cloth type and cycle time are set from the project’s own data instead of from a different ore’s performance.
Q3: How much capacity does a vertical press give compared with a plate-and-frame press?
A3: At the same filtration area, the HDLY delivers more than six times the throughput of a plate-and-frame press, and its four-column vertical structure does so on a smaller footprint, with automatic discharge and cloth washing between cycles.